New Home Construction

What the Per-Square-Foot Price Does Not Include

6 min read

Ask any builder in Midland what a custom home costs, and you will get a number per square foot. Ours are on our new home construction page: roughly $180 to $220 for a standard build, $220 to $270 for upgraded, and $270 to $320 and above for luxury.

Those numbers are useful. They are also the reason a lot of people walk into their first builder meeting with a budget that is already short.

The per-square-foot figure covers the house. It does not cover everything it takes to put that house on a piece of land in West Texas, and the gap between those two things is where most budget surprises live.

Here is what sits outside the number.

What the Price Per Square Foot Covers

TABLE (Gutenberg Table block, 2 columns, 11 rows, header on)

Line itemIncluded in the price per square foot
Foundation, framing, and roofIncluded
Exterior masonry, windows, and doorsIncluded
Interior finishes, cabinetry, and countertopsIncluded
Plumbing, electrical, and HVACIncluded
The lotSeparate cost
Clearing, grading, and drivewaySeparate cost
Utility runs, well and septicSeparate cost
Permits, engineering, and surveySeparate cost
Landscaping, irrigation, and fencingSeparate cost
Appliances and window coveringsUsually separate
Detached shop or metal buildingSeparate cost

What a given builder includes varies. Ask for the list in writing before comparing two numbers.

The lot

This is the largest item excluded from almost every per-square-foot quote you will see, including ours.

Land in Midland varies enormously by location, size, and whether it sits inside a developed subdivision with utilities at the curb or on acreage where nothing is run yet. A finished lot in an established neighborhood and five acres outside town are different purchases with different costs attached, and neither is included when a builder quotes you a price per square foot.

If you already own your land, you are ahead. If you do not, the lot needs its own line in the budget before anything else is decided, because it also constrains what you can build.

Site work

Once you have the land, it has to be made buildable.

Clearing and grading. Excavation. Bringing in fill or hauling material off. A driveway from the road to the slab. On a flat lot inside a subdivision, this is modest. On a lot that slopes, holds water, or sits well back from the road, it is not.

The soil test matters here too. In this part of Texas, soil moves with moisture, and what the geotechnical report says determines how the slab has to be engineered. A lot with difficult soil carries a higher foundation cost before a single wall goes up, and you cannot know that until the test comes back.

Utilities

Inside a developed subdivision, water, sewer, electric, and gas are usually at the property line, and the cost of connecting is predictable.

Outside one, every distance costs money. Running electric service a few hundred feet, drilling a well, or installing a septic system are each substantial line items. A septic system also needs a percolation test, and what that test says determines what kind of system is allowed, which changes the price.

This is the single biggest difference between building inside town and building on acreage, and it has nothing to do with the house itself.

Permits, plans, and fees

Architectural or design fees if you are starting from scratch rather than adapting an existing plan. Engineering for the foundation. Permit fees. Impact or tap fees where they apply. Survey work.

Individually these are small. Together they are a real number, and they arrive early, before there is anything to look at.

Landscaping, fencing, and the outside

Most quotes stop at the exterior walls.

Sod or seed, irrigation, beds and plantings, fencing, a covered patio if it was not framed into the original plan, and a shop or metal building out back. In West Texas, irrigation is not optional if you want anything to live, and it is easier and cheaper to sleeve under driveways and walkways while the concrete forms are still open than to cut them later.

Appliances, window coverings, and the last ten percent

Appliance packages are sometimes included and sometimes not. Ask specifically. Window coverings almost never are, and a house full of windows needs a meaningful budget for blinds or shutters.

Then there is the category nobody plans for: the last ten percent. Light fixtures you upgraded, the hardware you changed your mind about, and the extra outlets in the garage. None of these are large on their own, and together they are consistently underestimated.

Allowances, and why they matter more than the headline price

This is the part that separates two quotes that look identical.

Many builders price a house using allowances. A dollar figure for cabinets, a figure for countertops, and a figure for flooring are set before you have chosen anything. You make your selections months later, discover that what you actually want sits above the allowance, and the difference comes back as a change order.

A quote with low allowances looks cheaper than a quote with realistic ones and finishes the same price or higher.

When you are comparing builders, ask what the allowances are. Then ask what a typical client actually spends against them. The second answer is the useful one.

We handle this differently. Cabinetry and countertops are built and fabricated in our own shop, so those selections are priced as real selections rather than estimated as allowances, and they are locked before the contract rather than after it.

A more honest way to build the budget

Work it out in this order:

  1. The lot, either what you paid or what you expect to pay
  2. Site work and utilities, which depend entirely on that lot
  3. The house, using the per-square-foot range for the finish level you actually want, not the one that fits
  4. Permits, plans, and engineering
  5. Outside the walls, landscaping, irrigation, fencing, any outbuilding
  6. A contingency, because the soil test, a design change, or a material price can move
  7. Appliances and window coverings

Do that before you fall in love with a plan. A budget built in this order survives the project. One built backwards from a per-square-foot number does not.

What to ask any builder you meet

Four questions, and the answers will tell you more than a brochure. They are worth asking of every custom home builder in Midland you talk to, including us.

What is included in your per-square-foot number, and what is not? A builder who answers this clearly and specifically has done it many times.

What are the allowances, and what do clients typically spend against them?

Who does the cabinetry and the countertops? If the answer is a subcontractor, that is a cost and a schedule you do not control.

What happens when something changes? Change orders are normal. How they are priced and approved is what matters.

Closing paragraph

Crystal Cabinets Inc. has built custom homes in Midland since 1991, with our own crews from the slab through the framing, the roof, and the cabinetry and countertops out of our own shop.

For current per-square-foot ranges and what each finish level includes, see our new home construction page.

Have a Question We Did Not Cover?

Call or message us. If we have an answer, we will give it to you directly. If we do not, we will tell you that too.